Group Study Bogor – Jun & Jul 2012 – Introduction To Material Management

Posted on Updated on

GROUP STUDY BOGOR – INTRODUCTION TO MATERIAL MANAGEMENT ( J.R.Tony Arnold , Stephen N. Chapman ).
Date : June 30, July 7 & July 14, 2012

Indonesian Production and Operation Management Society (IPOMS) – Group Study Bogor (GSB) sebuah organisasi nirlaba yang mencoba untuk ikut mencerdaskan bangsa dan menaikan daya saing Sumber Daya Manusia Indonesia melalui keilmuan di bidang Manajemen Produksi, Operasi dan Inventory kembali hadir untuk menyelenggarakan Study Group dengan tema Dasar- Dasar Supply Chain Management dari referensi utama Buku Introduction to Material Management karangan J.R.Tony Arnold , Stephen N. Chapman, dengan agenda dibawah :

Saturday, June 30, 2012
09.00 — 11.00 wib Introduction to Material Management and Production Planning System
Ir.Fajar Hidayat, CPIM, MScM
11.00 — 12.00 wib Master Scheduling & Material Requirement Planning
Ir.Fajar Hidayat, CPIM, MScM
12.00 – 12.45 wib Break ( Praying and lunch)
12.45 — 13.45 wib Master Scheduling & Material Requirement Planning
Ir.Fajar Hidayat, CPIM, MScM
13.45 — 16.00 wib Inventory Fundamental
Rizal Arryadi,ST,MSIE,MSCS,CPIM,CSCP

Saturday, July 7, 2012
09.00 — 11.00 wib Production Activity Control and Capacity Management
D. Marshal Saluding, MM,CPIM,CSCP
11.00 — 12.00 wib Just in Time Manufacturing and Total Quality Management
D. Marshal Saluding, MM,CPIM,CSCP
12.00 – 12.45 wib Break ( Praying and lunch)
12.45 — 13.45 wib Just in Time Manufacturing and Total Quality Management
D. Marshal Saluding, MM,CPIM,CSCP
13.45 — 16.00 wib Physical Inventory, Physical Distribution and Warehouse Management
Masri Abdul Ghani, CSCP
—-
Saturday, July 14, 2012
09.00 — 11.00 wib Products and Processes
Iwan Nova,MBA, CPIM,CSCP
11.00 — 12.00 wib Purchasing and Forecasting
Iwan Nova,MBA, CPIM,CSCP
12.00 – 12.45 Break ( Praying and lunch)
12.45 — 13.45 wib Purchasing and Forecasting
Iwan Nova,MBA, CPIM,CSCP
13.45 — 16.00 wib Order Quantity and Independent Demand Ordering System
Iwan Nova,MBA, CPIM,CSCP

TEMPAT
STIE TRIGUNA BOGOR , Jl Siliwangi no 97 Sukasari – Bogor (Jalur ke STIE TRIGUNA bisa dilihat dibawah)

BIAYA
1. Untuk mengikuti kursus selama 3 hari sekaligus Rp. 1.200.000 ,-
2. Untuk mengikuti per hari Rp. 500.000 ,-
( Ada diskon 15% untuk anggota IPOMS dengan menunjukan bukti keanggotaan IPOMS)
Biaya kursus bisa ditransfer ke Rekening BCA a.n. Anang Yudi Riswanto, No. Rekening 4060324544 (BCA Cab. Cileungsi Bogor)

FASILITAS
– Makalah (Soft and hard copy)
– Makan siang dan snack
– Sertifikat
Untuk mendapatkan informasi lebih lanjut dapat menghubungi :
1. Anang YR
Email : [ anang_yr@yahoo.com ] , HP :0813-10385410
2. Robby Novricanus
Email : robby.novricanus@gmail.com , HP: 0816-1695164

REGISTRATION FORM
Please fill this form, send to Yudi.riswanto@id.pvmgrp.com, anang_yr@yahoo.com , robby.novricanus@gmail.com
Name :
Company/University :
Posisi / Dept. :
Address :
Phone/Mobile :
E-mail Address :
Payment Date :
Kami tunggu partisipasi anda semua.

Terima kasih
Best Regards,
Anang Yudi Riswanto.
Koordinator IPOMS
Bogor

Topics Training BSCM:
Introduction to Material Management and Production Planning System :
1. Operating Environment
2. The Supply Chai Concept
3. What is Material Management?
4. Supply Chain Metrics
5. Manufacturing planning and control system
6. Sales and operations planning (SOP)
7. Manufacturing Resource Planning (MRP II)
8. Entreprise Resource Planning (ERP)
9. Making the production plan.

Master Schedulling
1. Relationship to production plan
2. Developing a master production schedule.
3. Production planning, master scheduling and sales.

Master Requirement Planning
1. Bills of material
2. Material requirement planning process
3. Using the material requirements plan

Capacity Management
1. Definition of capacity
2. Capacity planning
3. Capacity requirements planning
4. Capacity available
5. Capacity required
6. Schdulling orders
7. Making the plan

JIT and TQM:
1. Just in time philosophy
2. Waste
3. JIT environment
4. Manufacturing planning and control in a JIT environment
5. Lean production
6. TQM
7. Quality cost concepts
8. Variation as a way of life
9. Process capability
10. Process control
11. Benchmarking

Production activity control
1. Data requirement
2. Order preparation
3. Scheduling
4. Load leveling
5. Schedule bottlenecks
6. Theory of constraints and drum buffer rope
7. Implementation
8. Control
9. Production reporting.

Purchasing and forcasting
1. Functional specification description
2. Selecting suppliers
3. Price determination
4. Impack of material requirements planning and purchasing
5. Some organization implications of supply chain management
6. Demand management
7. Charactreristics of demand
8. Principles of forcasting
9. Collecting and preparation data
10. Forcasting techniques.
11. Seasonality.
12. Tracking the forcast.

Inventory fundamentals and ordering systems.
1. Aggregate inventory management
2. Item inventory management
3. Inventory and the flow of material
4. Supply and demand patterns
5. Functions of inventories
6. Objectives of inventory management
7. Inventory cost
8. Financial statement and inventory
9. ABC inventory control
10. Economic order quantity (EOQ)
11. Variations of the EOQ model
12. Periode order quantity (POQ)
13. Determining safety stock
14. Determining service levels
15. Periodic review system
16. Distribution inventory

Physical Inventory, Warehouse Management, Product and Process:
1. Warehousing management
2. Physical control and security
3. Inventory record accuracy
4. Physical distribution system
5. Transportations cost element
6. Material handling
7. Multi warehouse systems
8. Need for new products
9. Product development principles
10. Process design
11. Selecting process
12. Continuous process improvement

Rute ke STIE Triguna Bogor :
Untuk menuju ke STIE Triguna kalau dari Jl. Raya Pajajaran menuju Tajur, putar balik di ujung sebelum traffic light (dekat Ekalokasari Plaza), kemudian belok kiri ke arah Asinan Gedong Dalem (atau Martabak Mungil), di ujung jalan tersebut (Jl. Sukasari) harus belok kiri, setelah pom bensin sebelah kiri itulah lokasi gedung STIE Triguna. Harus hati2 sebelum dan sesudah pom bensin banyak angkot dan L300 ngetem (biasanya macet).
Atau
Dari terminal Baranangsiang ( Bogor ), naik angkot 13 yang ke arah
Ramayana, lalu turun di Bogor Plaza . Dari Bogor Plaza naik angkot 02
Sukasari, lalu turun di depan kampus STIE Triguna (dekat pom bensin
sukasari). Ini rute macet.
Atau
Dari terminal Baranangsiang, naik angkot 09 yang ke arah Sukasari, lalu turun setelah angkot putar balik. Jalan sedikit ke arah Roti Unyil atau Martabak Mungil. Kampus STIE Triguna berada di sebelah kanan jalan

2 thoughts on “Group Study Bogor – Jun & Jul 2012 – Introduction To Material Management

    Fajar Sumirat said:
    July 25, 2012 at 11:04 am

    Wah…, ternyata saya baru tahu ada study group seperti ini di Bogor. Boleh tahu kapan ada lagi acara serupa, di semester 2 thn 2012 ?

      robbynovricanus responded:
      July 25, 2012 at 2:27 pm

      Pak Fajar, terima kasih atas kunjungannya.
      IPOMS mempunyai banyak study group di banyak kota.
      Salah satunya di #Bogor, kalau boleh email Bapak akan saya simpan untuk dikirim jika ada kegiatan group study #bogor atau Bapak bisa ikutan di milis APICS-ID@yahoogroups.com untuk kegiatan IPOMS secara umum atau milis study group #bogor secara khusus di Bogor-IPOMS@yahoogroups.com.
      Terima kasih
      @robbynovricanus

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s